Chandranigapur 4 MW Solar PV Project

Chandranigapur 4 MW Solar PV Project

Api Power Company Limited 4 MW Solar PV Plant lies at coordinate Longitude 85022'16" E to 85022'12" E, Latitude 27006'30" N to 27006'08" N and at elevation of approximately 132 m above mean sea level. The Project site is located in Chandranigahapur VDCs of Rautahat district. The Site is around 4kms on road from Deurali Chowk, Chandranigahapur on the Chandranigahapur-Gaur Road. The total land acquired for the 4 MW PV Plant is approximately 20 acres.

The project is carried out with techno commercial evaluation of multiple commercially established solar PV technologies for the proposed site location based on the benefits that any particular technology can offer for the project lifecycle of 25 years. As per this evaluation, monocrystalline technology has been chosen for the 4 MW Solar Project.  The project use LONGI LR4-72HPH-450M monocrystalline- half-cut  PV  modules  and  ABB PVS980-58-5000kVA Inverter. The project has been configured with a DC:AC  over sizing  of  1.35  in  combination  with  ABB PVS980-58-5000kVA  Central  Inverters  with  compatible operating  ranges.

The Project has been configured into a single modular plot having a DC capacity of 4.6 MWp with a inverter, of 4000 kW, with a maximum AC output of 4 MW. In order to minimize DC ohmic losses, inverters, MV transformers and switchgear shall be centrally located within the modular plot. The PV modules are electrically connected with cables sized to minimize DC ohmic losses. The DC electrical output from the PV modules is fed through DC cables of suitable grade to junction boxes, which are then connected to inverters. These inverters convert the DC electrical input to AC output and the same is then stepped up using a single 5 MVA 690 V/33 kV Transformer. The 33 kV AC electricity supply is then evacuated into the NEA owned grid through 33 kV transmission line that connect the project step-up transformer to the NEA owned grid substation.

Company has obtained the Survey License of the Project for 4 MW on dated 14th Mangsir, 2073 from Department of Electricity Development, Ministry of Energy. The detailed Survey of Project has been carried out. Company has entered into the Power Purchase Agreement (PPA) with Nepal Electricity Authority on dated 27th Shrawan, 2075.

The Project has started its Commercial Operation from 6th Bhadra, 2078 B.S (22nd August, 2021). 

 Project Summary of 4 MW Solar PV Plant

S.N.

Project Details

Descriptions

1

Project Authority

Api Power Company Limited

2

Project Capacity (MW) (AC side)

4 MW

3

Longitude

85022'16" E to 85022'12" E

4

Latitude

27006'30" N to 27006'08" N

5

Selected Location

Chandranigahapur

6

Nearest Major Town

Chandranigahapur

7

Accessibility

By East-West National Highway

8

Nearest Airport

Simara, Nepal

9

Solar Module Type

LONGI LR4-72HPH-450M monocrystalline- half-cut

10

Capacity of Each Module (W)

450

11

Strings in Parallel

394

12

No. of Modules

11032

13

PV System Mounting Structure Type

MS Galvanized

14

Power Conditioning Unit (Invertors) capacity

4000 kW X 1Nos

15

Power Conditioning Unit Specifications

Input Voltage Range 978-1350V (4000 kW)

16

No. of Invertors

1

17

Invertors Make

ABB

18

Cables and Earthing Systems

1 Set

19

Plant Load Factor (P50)%

22.90%

20

Expected CUF AC Capacity @ P75 %

22.20%

21

Land

20 Acres of Vacant Land

22

Land development

The Entire Station laid at a Plain Land

23

Power Evacuation

Through 33 kV Transmission Lines to NEA owned Grid Substation